JMD Construction - One Stop Solution For Home
1ST ISO CERTIFIED COSNTRUCTION
COMPANY IN SOLAPUR

Building a lifetime of memories

Let’s Numbers Talk
Happy Customers
0 +
Projects
0 +

Ontime Delivery

Our Specialization

Residential Construction

Elevating Concepts to Concrete Reality: Building Exceptional Homes and Spaces Through Expert Civil Construction

Our Packages

Design & Layouts


  • ARCHITECTURAL FLOOR PLAN
    3D ELEVATION
    BRICKWORK LAYOUT
    WORKING DRAWINGS
  • STRUCTURAL DRAWINGS

Earthwork


  • EXCAVATION IN HARD/ SOFT SOIL FOR FOUNDATION, AND
    REMOVING THE EXCAVATED EARTH UP TO 4 FEET IN HARD STRATA.

Structure


  • STEEL: SHREE OM AND ICON BRAND. (TMT 500 GRADE REINFORCEMENT STEEL TO BE PROVIDED AT 3 KGS/SQFT OF BUILT-UP AREA. ALL STEEL DESIGNS ARE AS PER STRUCTURAL ENGINEER’S DRAWING)
  • CEMENT: ZUHARI, CHETTINAD OR EQUIVALENT BRAND
  • PCC WORKS OF M15 GRADE 1:2:4
  • RCC WORKS OF M20 GRADE
  • FOR COLUMN FOOTING, PLINTH BEAMS, COLUMNS AND ROOF SLABS.
  • THICKNESS OF ROOF SLAB SHALL BE 5″ THICK
    RCC WORKS OF M20 GRADE FOR LINTEL, STAIRCASE
  • COLUMN SIZES WILL BE OF 9″X15″ MIN
  • SOIL TESTING (SBC OF 220KN/M2 AT 5′ DEPTH FROM EGL)
  • WATER PROOFING: DR. FIXIT
  • ROOF TO ROOF HEIGHT TO BE 10’0″
  •  6″ RED BRICKS FOR EXTERIOR & 4″ FOR INTERIOR
    CHICKEN MESH WILL BE USED NEAR BEAM,
    COLUMN, AND MASONRY WALL JUNCTION

Flooring


  • VITRIFIED FLOORING OF 30/SQFT (2FTX2FT) (@MRP)WILL BE PROVIDED
    FOR LIVING ROOM, KITCHEN &
    BEDROOMS
  • DOOR FRAME WITH CIMENT BASED
    CHOWKT
  • TANDOOR FLOORING WILL BE PROVIDED FOR STAIRCASE (TRADES
    AND RISER)
  • CERAMIC TILES FOR BALCONY &
    UTILITY FLOORING OF
    *30/SQFT(@MRP)
  • CERAMIC TILES FOR PARKING
    FLOORING OF 30/SQFT(@MRP)

Kitchen Counter


  • PROVIDING 4’0″ FEET HEIGHT
    GLAZED TILES (230 PER BOX) OVER
    20MM THICK, KITCHEN OTTA
    GRANITE TOP UPTO OF
    *80/SQFT(@MRP) AND REST ON
    POLISH KADAPPA FIXING WITH SS
    SINK OF SIZE 18″X21″ UP TO
    *1250(@MRP)

Bathroom


  • ANTI-SKID CERAMIC FLOORING FOR
    TOILETS AT 250 PER BOX
    .DADOING WORKS-7′ HEIGHT – COST
    OF TILE AT 250 PER BOX (TILE SIZE
    12″X 18″)
    SAME FOR WC DADOING

Door Frames With Fitting


  • MAIN DOOR-PROVIDING TEAKWOOD
    FRAME FOR MAIN DOOR WITH
    LAMINATED DOOR @ 10000/- (@MRP)
  • BEDROOM DOORS – PROVIDING ALL
    INTERNAL BEDROOMS DOORS OF
    LAMINATED DOOR @ 3000/- (@MRP)
  • BATHROOM DOORS – FOR BATHROOM
    FRP DOORS @ 2800/- (@MRP)

Window


  •  ALUMINUM WINDOW:
    *180/SQFT(@MRP) WITH
    POWDER COATED 3 TRACK
    TYPE, DESIGN 4 MM GLASS

Plumbing & Sanitation Lines


  • PROVIDING ALL PLUMBING
    WORK ARE CONCEALED
  • BY PVC/UPVC MATERIAL ( PRINCE, ASHIRWADH & EQUIVANT COMPANY).
    SANITARY FITTINGS AND CP.
    INCLUDING ALL FITTING
    MATERIAL UP TO 15000 ARE
    PROVIDED WITH PREMIUM-
    QUALITY

Electrical


  • 3 LIGHT POINTS PER ROOM, 1 FAN POINT & 3 NOS OF 5 AMP
    PLUG POINT & KITCHEN OF 15 AMP PLUG POINT
    DISTRIBUTION BOX OF
    DOMESTIC MAKE.
  • KEI WIRINGS AND / VINAY
    SWITCHES AND SOCKETS

Miscellaneous


  • OVERHEAD WATER TANK
    UP TO 1000 LITER OF
    SINTEX/PLASTO MAKE
    MS RAILINGS FOR
    INTERNAL & EXTERNAL
    STAIRCASE

Design & Layouts


  • STEEL: ICON AND SHREEOM OR EQUIVALENT BRAND. (TMT 500 GRADE REINFORCEMENT STEEL TO BE PROVIDED AT 3 KGS/SQFT OF BUILT-UP AREA. ALL STEEL DESIGNS ARE AS PER STRUCTURAL ENGINEER’S DRAWING)
  • CEMENT: ULTRATECH OR EQUIVALENT BRAND
  • PCC WORKS OF M15 GRADE 1: 2:4
  • RCC WORKS OF M20 GRADE FOR COLUMN FOOTING, PLINTH BEAMS, COLUMNS AND ROOF SLABS. THICKNESS OF ROOF SLAB SHALL BE 5″ THICK
  • RCC WORKS OF M20 GRADE FOR LINTEL, CANOPY PROJECTIONS, STAIRCASE
  • COLUMN SIZES WILL BE OF 9″X18″ MIN
  • SOIL TESTING (SBC OF 220KN/M2 AT 5′ DEPTH FROM EGL)
  • WATER PROOFING: DR. FIXIT
  • ROOF TO ROOF HEIGHT TO BE 10’0″
  • 6″ RED BRICKS FOR EXTERIOR & 6″ FOR INTERIOR
  • CHICKEN MESH WILL BE USED NEAR BEAM,
    COLUMN, AND MASONRY WALL JUNCTION

Earth Work


  • EXCAVATION IN HARD/ SOFT
    SOIL FOR FOUNDATION, AND
    REMOVING THE EXCAVATED
    EARTH UP TO 5 FEET IN HARD
    STRATA.

Flooring


  • VITRIFIED FLOORING OF 45/SQFT (2FT X4FT)
    (@MRP)WILL BE PROVIDED FOR LIVING ROOM,
    KITCHEN & BEDROOMS
  • PROVIDING ALL INSIDE WINDOWS AND DOORS
    WITH GRANITE FRAME UP TO OF
    85/SQFT(@MRP) | GRANITE FLOORING WILL BE
    PROVIDED FOR STAIRCASE (TRADES) OF
    85/SQFT@MRP
  • CERAMIC TILES OR PAVER FOR PARKING
    FLOORING OF 30/SQFT(@MRP)

Kitchen Counter


  • PROVIDING 4’0″ FEET HEIGHT GLAZED TILES (40/SQFT) OVER 20MM THICK, KITCHEN OTTA GRANITE TOP UPTO OF
    *100/SQFT(@MRP) AND REST ON POLISH KADAPPA FIXING WITH SS SINK OF SIZE 18″X24″ UP TO *2500(@MRP)

Bathroom


  • ANTI-SKID CERAMIC FLOORING FOR TOILETS
    AT *40/SQFT(@MRP)
    DADOING WORKS – 7 HEIGHT FROM FLOORING
    COST OF TILE AT 40/SQFT (@MRP)

Door Frames With Fitting


  • MAIN DOOR-PROVIDING TEAKWOOD
    FRAME FOR MAIN DOOR WITH
    LAMINATED DOOR @ 20000/- (@MRP)
    WITH ALL FITTING AND FIXTURES.BEDROOMS DOORS OF LAMINATED DOOR @ 3500/- (@MRP) WITH ALL FITTING AND FIXTURES
  • BATHROOM DOORS – FOR
    BATHROOM FRP DOORS @ 3000/-
    (@MRP) WITH ALL FITTING AND
    FIXTURES

Window


  • ALUMINUAM WINDOW:
    200/SQFT(@MRP) WITH
    POWDER COATED 3 TRACK TYPE,
    DESIGN 4 MM GLASS

Plumbing & Sanitation Lines


  • PROVIDING ALL PLUMBING WORK ARE CONCEALED
    BY PVC/UPVC WITH ISI MARK MATERIAL PRINCE, ASHIRWADH,SUPRIM COMPANY ETC).
  • SANITARY FITTINGS AND CP FITTING OF UP TO 25000/BATHROOM ARE PROVIDED WITH PREMIUM-QUALITY BATHROOM INCLUDES FLOOR MOUNTED CLOSET, WASHBASIN & CP FITTINGS OF
    HINDWARE, PARRY WARE OR
    EQUIVALENT.

Electrical


  • PROVIDING ALL PLUMBING WORK ARE CONCEALED
    BY PVC/UPVC WITH ISI MARK MATERIAL PRINCE, ASHIRWADH,SUPRIM COMPANY ETC).
  • SANITARY FITTINGS AND CP FITTING OF UP TO 25000/BATHROOM ARE PROVIDED WITH PREMIUM-QUALITY BATHROOM INCLUDES FLOOR MOUNTED CLOSET, WASHBASIN & CP FITTINGS OF
    HINDWARE, PARRY WARE OR
    EQUIVALENT.

Miscellaneous


  • OVERHEAD WATER TANK UP TO 1500
    LITER OF SINTEX/PLASTO MAKE
    .SS RAILINGS FOR INTERNAL &
    EXTERNAL STAIRCASE
    . WINDOWS MS GRILL WITH ENAMEL
    PAINT OF RS. 190/SQFT

Painting


  • INTERNAL WALLS AND CEILINGS- TWO COATS OF TRACTOR EMULSION, ASIAN (OBD) PAINT; OVER 1 COAT OF PRIMER & 2 COATS OF BARGER (OBD RANGE 110- 120/- PER LIT)
    EXTERNAL – TWO COATS OF APEX
    PAINTS OVER 1 COAT OF EXTERNAL PRIMER (PRIMER RANGE ₹55-60/- PER LIT, APEX PAINT RANGE 100-110/- PER LIT)

Earth Work


  • Excavation in hard/ soft soil for foundation, and removing the excavated earth up to 5 feet in hard strata.

Structure


  • Steel: POLADD AND RAJURI OR EQUIVALENT BRAND. (TMT 500 GRADE REINFORCEMENT STEEL TO BE PROVIDED AT 3 KGS/SQFT OF BUILT-UP AREA. ALL STEEL DESIGNS ARE AS PER STRUCTURAL ENGINEER’S DRAWING)
  • Cement: ULTRATECH OR EQUIVALENT BRAND PCC WORKS OF M15 GRADE 1:2:4
    RCC WORKS OF M20 GRADE FOR COLUMN FOOTING, PLINTH BEAMS, COLUMNS AND ROOF SLABS. THICKNESS OF ROOF SLAB SHALL BE 5″ THICK
  •  RCC WORKS OF M20 GRADE FOR LINTEL, CANOPY PROJECTIONS, STAIRCASE
  • COLUMN SIZES WILL BE OF 9″X18″ MIN
  • SOIL TESTING (SBC OF 220KN/M2 AT 5′ DEPTH FROM EGL)
  • Water Proofing: Dr. Fixit
  •  ROOF TO ROOF HEIGHT TO BE 10’0″
  • 9″ RED BRICKS FOR EXTERIOR & 6″ FOR INTERIOR CHICKEN MESH WILL BE USED NEAR BEAM,
    COLUMN, AND MASONRY WALL JUNCTION 

Flooring


  • VITRIFIED FLOORING OF 60/SQFT (2FT X4FT)
    (@MRP)WILL BE PROVIDED FOR LIVING ROOM,
    KITCHEN & BEDROOMS
  •  PROVIDING ALL INSIDE WINDOWS AND DOORS
    WITH GRANITE FRAME UP TO OF
    *100/SQFT(@MRP)
  • GRANITE FLOORING WILL BE PROVIDED FOR
    STAIRCASE (TRADES) OF 110/SQFT(@MRP
  • CERAMIC TILES FOR BALCONY & UTILITY
    FLOORING OF *50/SQFT(@MRP)
  • CERAMIC TILES FOR PARKING FLOORING OF
    *50/SQFT(@MRP)

Kitchen Counter


  • PROVIDING UP TO CEILING
    HEIGHT GLAZED TILES
    (F40/SQFT) OVER 20MM THICK,
  • KITCHEN OTTA GRANITE TOP UPTO OF 130/SQFT(@MRP) AND REST ON POLISH KADAPPA FIXING WITH SS SINK OF SIZE 18″X24″ UP TO 3000(@MRP)

Bathroom


  • ANTI-SKID
    CERAMIC FLOORING FOR
    TOILETS AT 50/SQFT(@MRP)
  • DADOING WORKS 7′ HEIGHT COST OF TILE AT 50/SQFT(@MRP)

Door Frames With Fitting


  • MAIN DOOR-PROVIDING TEAKWOOD FRAME FOR MAIN DOOR WITH LAMINATED DOOR @ 30000/- (@MRP) WITH ALL FITTING AND FIXTURES
  • BEDROOM DOORS – PROVIDING ALL INTERNAL BEDROOMS DOORS OF LAMINATED DOOR @ 5000/- (@MRP) WITH ALL FITTING AND FIXTURES
  • BATHROOM DOORS – FOR BATHROOM FRP DOORS @ 3000/- (@MRP) WITH ALL FITTING AND FIXTURES

Window


  • ALUMINUAM WINDOW:
    *250/SQFT(@MRP) WITH
    POWDER COATED 3 TRACK TYPE,
    DESIGN 4 MM GLASS

Plumbing & Sanitation Lines


  • PROVIDING ALL PLUMBING WORK ARE CONCEALED
  • BY PVC/UPVC MATERIAL (SUPRIME PRINCE, ASHIRWADH COMPANY). OSANITARY FITTINGS AND CP
    FITTING OF UP TO
    PROVIDED WITH
    40000/-ARE
    PREMIUMQUALITYBATHROOM
    FITTINGS – EACH BATHROOM INCLUDES FLOOR MOUNTED
    CLOSET, WASHBASIN & CP
    FITTINGS OF HINDWARE, PARRY
    WARE OR EQUIVALENT MAKE.

Electrical


  • 3 LIGHT POINTS PER ROOM, 1 FAN
    POINT & 3NOS OF 5 AMP PLUG POINT
    . GYPSAM POP DESING IN HALL
    .1 HEATING POINT OF FOR EACH TOILET
    & KITCHEN OF 15 AMP PLUG POINT
  • DISTRIBUTION BOX OF DOMESTIC
    MAKE
  • POLYCAB WIRINGS AND ANCHOR /
    VINAY SWITCHES AND SOCKETS

Miscellaneous


  • OVERHEAD WATER TANK 2 OF 1000
    LITERS OF SINTEX/PLASTO MAKE
  • SS RAILINGS FOR INTERNAL
    (STAIRCASE)
    FRONT SIDE EXTERNAL BALCONY
    TOUGHENED GLASS RAILING

Painting


  • NTERNAL WALLS AND CEILINGS- TWO COATS OF WATER LUSTER, ASIAN PAINT: OVER 2 COAT OF PRIMER & 2 COATS OF BERGER/NEROLACK (RANGE = 400-600/- PER
    LIT)
  • EXTERNAL – TWO COATS OF APEX ULTIMA PAINTS OVER 2 COAT OF EXTERNAL PRIMER (PRIMER RANGE 50-60/- PER LIT, APEX ULTIMA PAINT RANGE = 120-150/- PER LIT)
Why Choose Us

Our Aim

Warranty

15 Years of Structural Warranty

Dedicated Engineer

Dedicated Full Time Civil Engineer With Each Project

No Third Party

No Involvement of Third Party Contractor

Best Price

Best Price Without Compromising Quality

Quality Checks

450+ Quality checks for superior work

Brand Partners

Only Work With Branded Material

Our Packages

Harmonizing Visions, Crafting Desires: We commence by deeply comprehending your needs, merging our expertise with your aspirations. At Engineer Construction Wala, your requirements lay the foundation for a personalized, exceptional construction experience.

Transparent Financial Planning, Every Step of the Way: Our meticulous cost estimation process guarantees clarity, giving you a comprehensive view of investment, and eliminating surprises as we navigate the path to your envisioned living space. At Engineer Construction Wala, we believe in building trust through accurate financial guidance.

Crafting Blueprints into Reality: Our expert architects breathe life into your ideas, meticulously designing spaces that blend functionality with aesthetics. With Engineer Construction Wala, your vision takes shape through innovative architectural planning, creating spaces that resonate with your lifestyle and preferences.

Punctual Precision, Every Step of the Way: We orchestrate a seamless timeline for your project, ensuring each phase unfolds promptly and efficiently. At Engineer Construction Wala, our project scheduling guarantees that your dream home becomes a reality on time, without compromising on our commitment to quality craftsmanship.

Laying Foundations, Setting Dreams in Motion: As we break ground, your aspirations take physical form. Engineer Construction Wala initiates the site execution with a blend of modern techniques and skilled craftsmanship, infusing life into your vision and marking the beginning of your dream home’s construction journey.

Culmination of Excellence, Keys to Your Kingdom: With meticulous attention to detail, Engineer Construction Wala ensures a smooth and professional project handover. As we place the keys to your meticulously crafted haven in your hands, we mark the successful conclusion of our journey together, built on trust, innovation, and the pursuit of architectural perfection.

Happy Clients

Tech Advancement

The technique and science of determining the terrestrial, i.e. the three-dimensional position of points and the distances and angles between them, using digital

Digital Survey

It involves measuring the soil's liquid limit, plastic limit, and shrinkage limit. These limits provide valuable information about the soil's behavior and nature

Soil Test

concrete cube test involves taking a sample of freshly mixed concrete, letting it cure, then crushing it and measuring its compressive strength. Many concrete

Cube Test

Building information modeling is a process involving management of digital representations of the physical and functional characteristics of buildings

BIM Technology

we take pride in our commitment to excellence and transparency. With our daily progress tracking reports, we ensure our clients stay informed every step of the way.

Progress Report

Cost Estimator